Promotion service in Adur (formerly Adur Promotion Service)
How to apply to display banners and boards at designated sites
Across Adur, we have a number of designated sites that are available to commercial businesses and events, charitable groups and not-for-profit organisations for the display of banners and boards in the two-week period leading up to your event.
Banners and Display Boards are free of charge to all local Adur events arranged by a community group or a charity. If you are a CIC (Community Interest Company), you will be required to provide your company registration details. For all commercial events, including all events which require an admission ticket or entrance fee, there is a weekly charge of £20.00 plus VAT (£24.00) per week. Where applicable, if you are a charity, please provide your charity exemption certificate to ensure you are not charged VAT.
Banners and display boards must conform to the following:
- No banner is to exceed 1.5 square metre or 2.5 metres in length, and 1 metre in depth
- No display board to exceed 1 square metre (optimum dimensions for each site are displayed on the application form)
- No banner or board to be installed more than two weeks prior to the event and it must be removed immediately afterwards
- No return to the same pitch within two weeks of booking ending, except in exceptional circumstances
- A banner or board must only be promoting a local event in the Adur and Worthing area
- Each site has been surveyed to allow for a maximum number of banners/boards at any one time; this number cannot be exceeded
Applications must be received at least four weeks before the start of display (six weeks before the event), and will be considered with the following conditions:
- All applications will be considered on a first come, first served basis
- The applicant is responsible for ensuring that they have adequate and suitable public liability insurance, to a minimum of £5 million. A copy of the certificate will be required upon approval of application
- The safe fixing and removal of banners or display boards is the responsibility of the applicant, once they have received notification of approval
- Applicants must ensure that banners and boards are securely attached at all times
- Each banner and board display site differs in size. It is the applicant's responsibility to check the dimensions of their designated site to achieve a secure fit with optimal presentation
- Adur District Council reserve the right to remove any banner or board that is considered insecure, inappropriate or of a size in excess of that agreed
- The positioning of any banner or board must not cause a conflict with any road users and road safety
- Banners and boards must be removed immediately after the event. Late removals will incur an additional weekly charge to cover our costs for removal
- A maximum display period of two weeks applies to all bookings. If the event is over a longer period, then we may be able to agree to a longer display period of up to 28 days maximum but only in exceptional circumstances
Locations and sites available for the display of banners and boards
Shoreham-by-Sea:
- SHR001: Buckingham Park: 3 spaces available
- SHR002: Coronation Green (west of foot bridge): 6 spaces available
- SHR003: Ham Rec. (facing north), Eastern Avenue: 2 spaces available
- SHR004: Ham Rec. (facing south), Brighton Road: 4 spaces available
- SHR005: Eastern Avenue allotments: 6 spaces available (3 north, 3 south)
- SHR006: Middle Road allotments: 3 spaces available
Southwick / Fishersgate:
- SWK001: Southwick Green facing Southwick Square: 4 spaces available
- SWK002: Fishersgate Recreation Ground: 3 spaces available
- SKW003: Kingston Lifeboat Station: 3 spaces available
Lancing:
- LAN001: Lancing Manor (to the east of bus shelter): 5 spaces available
Apply to display your event banner(s) or board(s)
You can now make your application and any payment online using our portal. Please use the link below to access the application system:
See also:
Need assistance with this service?
Get in touch:
Commercial Activity Team
Problem with this page?
Page last updated: 07 October 2026